Logistec Moves to Pier 9

The PCTC Thalatta tied up at pier 9, and looks to be unloading Heavy Equipment from JCB. Equipment can be seen parked on the pier, and some rail cars are in the terminal to take some of it onward.

Logistec looks to have made the move to pier 9. Much of their orange coloured equipment can be seen parked on the permitted of Pier 9. Logistec traditionally was based on Pier A1, and frequently handled these types of deliveries there.

The transit shed on pier A1 is scheduled for demolition as part of the the infiling of basin between Pier A1 and B for the expansion of the PSA Halifax Atlantic Hub, which is due to begin in May.

Related Posts Plugin for WordPress, Blogger...

Leave a Reply

Your email address will not be published. Required fields are marked *