GPO Grace Returns

the Heavy lift ship GPO Grace returned to Halifax this afternoon and took to the Inner Anchorage. the ship is loaded with Vineyard Wind’s third load of Monopiles and transition Pieces.

Fleet Mate GPO Sapphire has been tied up at Woodside for a few weeks.

The Crew there seem to have gotten comfortable,Note the turf and the swimming pool on the bridge wing.

Related Posts Plugin for WordPress, Blogger...

Leave a Reply

Your email address will not be published. Required fields are marked *