December catchup

December is always a busy month, and this past December lead to a lack of posting, though a number of notable things happened.

The bow section of the future HMCS Harry Dewolf was rolled out and attached, giving us the first view of what the completed ship will look like. The second vessel is also underway, and steel was cut for the third in Dartmouth.

In other New build navy news the NRU Asterisk arrived in Halifax and tied up at pier 20. I missed her arrival and the seaport was locked when I attempted to go get photos. The NRU prefix stands for Naval Replenishment Unit. She will operate with a civilian crew and military specialists, similar to the Royal Fleet Auxuilery (UK supply ships) or the American Military Sealift Command (USNS vessels)

PCTC Bess tied up at pier 27 to offload some heavy equipment. The general cargo vessel Floringracht offloaded some machinery, and then loaded what appeared to be rebar. with Container traffic up almost 20% over last year, which was also up significantly over the previous year, halterm is expanding its lay out area along marginal road, which will likely block photos like this in the future.

Selfoss put in 2 weeks ago fro Eimskip, and tied up at pier 42. This made for easy photography. On the 28th Aristomenis stopped at pier 42 for Happag Lloyd. The vessel was previously the Hanjin Netherlands, and was presumably sold or re-chartered after Hanjin’s bankruptcy. Hanjin logo is still visible on the funnel, under the Happag Lloyd orange paint, and her old name is still welded to the hull but painted over. The ship was built in 2011

Related Posts Plugin for WordPress, Blogger...

Leave a Reply

Your email address will not be published. Required fields are marked *