AOPS Update

Work Continues on the first ship, with testing under way – the Boat Davit appears to have recently load tested, given the empty bag still hanging from it. some of the construction coverings are coming off, and system testing is under way.

The remote gun mount on the bow of Harry DeWolf

the Launch of the Second ship is Due sometime between October 19 and November 19, based on the Coasting trade application for the use of the Boa Barge. that would suggest the plan is to turn the first ship over to the navy before then.

I suspect the yard is under political pressure to hand the ship over prior to the start of the federal election campaign.

Related Posts Plugin for WordPress, Blogger...

Leave a Reply

Your email address will not be published. Required fields are marked *