Having completed her FELEX refit, HMCS Montreal has spent the last few days on Workups. Montreal is the third Ship to go through the FELEX process, and was returned to the Dockyard back in September. She now Joins Halifax And Fredericton as being complete, and on to workups.
Montreal was used as the test vessel for the cyclone, so she likely carries the modifications for this Helo, as does Halifax. Fredericton retained the Seaking layout, though likely had the deck strengthened.