The container vessel Renate Schulte has been laid up at halterm since before Christmas. What was originally thought to have been holiday related delay, turns out to be a hull repair. she reportedly has a 4×4 hole cut in her port side as the anchor came loose and cracked a plate. As a result of the crack, the bow thruster compartment flooded.
Thanks to Mac at shipfax for the tip that there was an issue with the vessel.
UPDATE: word is the original contractor walked away from the job in some sort of dispute. The work was supposed to be completed in Ireland.