African Dhalia sailed at 1300 as scheduled, freeing up Pier 27 for Fairlane.. which she sailed past into the basin.
Jumbo Shipping Vessels are equipped with dynamic positioning, and built to perform sub-sea installations. In other words, they can lift and offload cargo in open water without being tied to a wharf.