Pier 9 is collecting a selection of Damaged vessels. The most recent addition is the Stadt Cadiz, which is the operated by CMA-CGM as their contribution to their shared service with Maersk.
She arrived, late, from Montreal last week, and then unloaded all her boxes and proceeded to pier 9. It is unclear if she will be repaired here, or will be towed to a shipyard somewhere.
The Bulk Carrier Harefield is still tied up, awaiting repairs to her damaged rudder. though work seems to have resumed in the past few days.