The Maersk Dispatcher arrived in Halifax earlier this week, and has been working with the GSF Grand Banks Today. It Appears the GSF grand banks’ maintinace period is neering completion as she has the lifeboats deployed, and is working with the supplier.
Maersk Dispatcher’s sister ship, Maersk Detector collided with one of the columns on the GSF Grand Banks, damaging both ships above the water line, and requiring the grand banks’ maintinance period to be moved forward by a few weeks.