Work Continues on the Dorothea. Now pulling planks that are out, into the ribs. Chips in the hull are also being epoxyied back into place.
The wedges are under a member which is bolted through the hull to pull everything in tight. The Planks are then screwed down tight into the ribs.
![Related Posts Plugin for WordPress, Blogger...](http://www.linkwithin.com/pixel.png)