I missed the actual departure, but the Boa Odin Took her pilot (Above) and connected towing lines. (Below). She sailed for Tampa at 13:00
CBC Is reporting 2 containers were lost in the water at Halterm.
ZIM Vancouver and ZIM Haifa are both tied up at Pier 41/42. the most likely scenario is a container was swung by a crane into the stack aboard ship, knocking 2 into the water.
Update:
I’m told it happened Early into the Night Shift, and shipfax stated it was 2 20foot containers. these can be handled as a pair, so its possible the spreader on the crane failed.
The Second Half of the Nova Dock being loaded on Boa Barge 33 for delivery to Tampa.
the First half was moved in October.
UPDATE: shes due to sail tomorrow. Work is underway from barges to secure her to the deck.
The past few days has been busy for tankers in the Narrows.
Skylark Tied up at Nova Scotia Power on Saturday, and sailed Sunday.
This morning, the Woodward Group tanker Nanny tied up at Pier 9. Wilson’s Fuels has a pout there to refill their tank farm, though here previous ports were Baker Lake and Come by Chance, so she may be here for supplies or repairs.