CSS Acadia Dry Docking

The Province has released the RFP for the Dry docking of the CSS Acadia. the CSS Acadia was built in 1913, and is 106 years old. The much needed work was announced last December.

The Scope of work includes Sandblasting and repainting the hull, Testing and replacement of Steel less then 1.4″ thick, Replacement of a hatch cover, replacement of a fuel tank, improved access to the engine room, and some restoration and maintenance work.

the ship is to be towed to a shipyard, and when returned, will be docked bow in.

Related Posts Plugin for WordPress, Blogger...

Leave a Reply

Your email address will not be published. Required fields are marked *