Leave a reply
Monthly Archives: September 2015
Hagen at pier 9
The bulk carrier Hagen showed up at pier 9 on Friday. It’s possible she will be installing cable handling gear, as there appears to be equipment laid out on the pier.
Built in 1998 she arrived from Rotterdam.
She is registered in Antigua and Barbuda.
Edit: she is not the rumoured mckeil bulker, though was suggested as a possibility at one point.