Maersk Maker at Pier 9

The brand New Anchor Handling Supply Tug Maersk Maker arrived this morning at pier 9, after spending yesterday with the crane ship Thialf. The Ship was Built in 2019, and is flagged in St. John Newfoundland.

From Maersk’s brochure on the ship:

Maersk Maker is a DP2 deep water anchor handling tug supply vessel (AHTS) of SALT design. This state-of-the-art vessel is built for deep water anchor handling and oilfield operations with reliability, safety and minimized environmental footprint as a top priority.Powered by five medium speed engines with total output of more than 23,000 horsepower, a fuel efficient and flexible hybrid propulsion system and fixed pitch on all side thrusters, the vessel provides good fuel economy, low emissions and excellent station keeping capabilities (ERN 4 x 99). Also designed for high safe deck operations, the vessel is equipped with a multi deck handler system, anchor recovery frame, gypsy handling system and other aid

Related Posts Plugin for WordPress, Blogger...

Leave a Reply

Your email address will not be published. Required fields are marked *