![](https://blog.halifaxshippingnews.ca/wp-content/uploads/2023/04/IMG_2442.jpg)
BBC Challenger arrived at pier 9 on Wendsday to load boilers which have been on the dock for a while now. The loading took place on Good Friday.
BBC Challenger was built as Thorco Challenger in 2008. the ships cranes are rated at 80 tons each, for a combined lift of 160 tons.
![Related Posts Plugin for WordPress, Blogger...](http://www.linkwithin.com/pixel.png)