The Zhen Hua 23 arrived Monday morning with 2 new cranes for the PSA Atlantic Hub. The first of the cranes was moved shore side this morning. As part of the Installation, crane 5 will also be moved next too the two new cranes.
the 2 green cranes are bound for PSA’s terminal in Sines Portugal.