Category Archives: National Gypsum

3x CSL

(Above) After taking on a cargo of gypsum, Baie St Paul took the the inner anchorage. the ship is set to sail this evening into the lakes. (below) another CSL Ship, Rt Hon Paul E Martin tied up at the Gold Bond wharf. A Ocean going bulker, its likely headed for Baltimore. CSL Tarantau, another ocean going bulker is waiting in the basin to take its place.

Baie St. Paul departs National Gypsum

The Baie St. Paul made its first call to Halifax, Loading Gypsum for Cote Ste. Catherine in Quebec. The ship sailed just after 1400 on Sunday.

Baie St Paul is the first of 4 trillium Class Geared Bulkers, and was completed in China in 2012. CSL Also built 6 new panamax Trillum Class Ships for its Americas fleet, though they are built like traditional ocean going bulkers, and lack the seawaymax form of the Lakers. 2 additional trillium class lakers were built without the self unloading gear.

Though built in China, the ships were not built for ocean voyages, and arrived with temporary reinforcing that was removed on arrival to Canada. Baie St. Paul had additional reinforcing added during last winters layup to allow it perform coastal work. – Previous CSL Lakers were common callers in Halifax, Particularly Atlantic Huron and Salarium