Author Archives: Peter Ziobrowski
Nova Dock Needs to be Replaced
I have heard rumors that the Nova dock at Halifax Shipyard was broken and in repair.
Today I received confirmation of this:
I was told that the Nova Dock has needed repairs since at least April, and that after evaluating options, costs to repair are approaching the cost of a New Submersible Dock. They have therefore decided to replace the dock. as the shipyard does not have the facilities to build a new dock, and are therefore in the process of attempting to source a replacement.
Shipspotting 101: Bulk Carriers.
Another type of geared Bulker uses cranes and clamshell buckets for unloading. Universal Amsterdam clearly shows the clamshells on deck between the First and second Crane.
Other Vessels, offer both Options – Such as Barkald, Which has both unloading Cranes and the Self unloading arm. Presumably this offers some flexibility, such as being able to load trucks or rail cars directly with the buckets at unimproved ports.
While this post has concerned itself with unloading, We do have 2 posts on Loading. first we have Patron, a Small gearless Bulker loading grain for export. We also had a post on the geared bulker Irma loading wood Pellets.
Route Halifax St Pierre Starts
The Art of Stevedore
Windmill Parts for Sheet Harbour.
The HHL Tokyo arrived last night for bunkers, and will be proceeding to Sheet Harbour to unload wind turbine parts.
Designed for project cargo and heavy lift, HHL Tokyo was built as Beluga Procession, originally for upstart Beluga, who attempted to grow to fast and collapsed in 2011. (Beluga made a few trips to Halifax, including delivering new CGCS Lifeboats) She was Picked up by Hansa Heavy Lift of Germany as a brand new vessel, being on the blocks when Beluga Failed.
Bright Fortune Waits Her Turn
Route Halifax Saint Pierre. Starts Tomorow.
Beauforte with Rails
The general Cargo Ship Beauforte has been tied up at pier 27 for the past week. I believe she was here with a load of rails for CN. She sailed from Poland on the 14th of June. She is owned by Beau Shipping, and currently chartered to Onego.
Built to an off the shelf design, she is a Damen Combi Freighter 8200, and was built in 2011. As an off the shelf Design, any shipyard can be licensed to produce it. For example, The Canadian Coast Guards Hero Class are Damen Designs, and have been built for many countries, by different yards.